Project duration: 3 weeks Project Budget: N/A Project Cost: £42,000.00 Full strip out of existing water damaged walls , floors and cubicles to Boys & Girls Tech toilets New Splash range IPS and cubicle systems supplied by TBS Amwell New SanCeram sanitaryware supplied by The sanitaryware Company. O&M Files to keep up…
SME Awards 2022
Early 2022 SJT was shortlisted for the Northern Enterprise Awards for best Building & Joinery Contractors. Several months later we had great pleasure in receiving a notification with conformation that the voting process had closed…….. and……WE WON!!!! Feel free check out our winners supplement over at SME News. Northern Enterprise…
Harrop Fold School (Manchester)
Project duration: 3 weeks Project Budget: N/A Project Cost: £25,000.00 Industrial Cleaning of Cladding Re spray of Existing Kingspan Insulated Cladding O&M Files to keep up with maintenance
East Leake Academy (Loughborough)
Project duration: 4 weeks Project Budget: N/A Project Cost: £146,000.00 Six Monthly Fire Door Inspections Replacement of damaged doors to our IFC third party accredited door sets Remedial repair work on existing doors and components Replacement of internal glazing Pyro Fire Glass Conformity certification documentation New O&M Fire Door File
Lister Community School (London)
Project duration: 3 weeks Project Budget: Undisclosed Project Cost: £75,000.00 Removal of existing roof plant chillers Design of new chiller to replace existing two with one that runs a lower environmental impact at high full and part load efficiency (design by GPJ Consulting Engineers Ltd) CDM Mechanical and electrical installation of new…
King Ecgbert School (Sheffield)
Project duration: 3 weeks Project Budget: Undisclosed Project Cost: £39,000.00 Removal of existing perished timber decking Installation of new foundations and sleeper walls Construction of new composite decking to form new out door seating area
Hinde House School (Sheffield)
Project duration: 5 weeks Project Budget: £120,000.00 Project Cost: £100,000.00 Six Monthly Fire Door Inspections Replacement of damaged doors to our IFC third party accredited door sets Remedial repair work on existing doors and components Conformity certification documentation
Harrop Fold School (Manchester)
Project duration: 6 weeks Project Budget: £160,000.00 Project Cost: £157,000.00 Conversion of old ten centre Conversion of existing space to create 10nr classrooms Refurbishment of existing corridor and open the space up to link the existing school building Soundproofing of floor slab
Summerhill School (Birmingham)
Project duration: 6 weeks Project Budget: £100,000.00 Project Cost: £90,000.00 Reception refurbishment and new entrance Refurbishment of admin office CEO office and meeting rooms
Sheffield Hallam University
Project duration: 25 weeks Project Budget: £6,000,000.00 Project Cost: £980,000.00 (SJT package only) Internal conversion of office space to new food and study hall over 2 floors Stripping of existing office spaces to create new workspace for student Total internal refurbishment including M&E upgrades and fire protection Façade cladding to…